Press release from the Brandenburg State Roads Authority dated 20 July 2021
From next Monday, 26 July 2021, Berghofer Weg in Rüdersdorf will be fully closed. The reason for this is the section-by-section renewal of the carriageway surface. Berghofer Weg is being upgraded between Woltersdorf and Rüdersdorf (Märkisch-Oderland) because the road is to be used as a diversion route when the replacement construction of the bridge over the Stolp Canal begins.
The plan is to carry out repairs to the asphalt surface and the verge in the roadside area. At the same time, the drainage troughs will be redesigned and regulated. The road improvements will take twelve days, until Friday, 6 August 2021. A date for the start of the bridge construction work has not yet been set.
Traffic will be routed via the L 302 state road (Schöneicher Landstraße), the K 6421 district road (Vogelsdorfer Straße) and Wilhelm-Tell-Straße and vice versa. During the entire closure, local traffic will be guaranteed via the access road of the municipality of Woltersdorf.
The state road authority asks for your understanding for the restrictions during the entire construction period.
Information on the current roadworks in the state can be found in brief in the roadworks information system of the state road authority: https://www.ls.brandenburg.de/ls/de/bauen/baustelleninformationssystem/

