Please note that both the footpath (for pedestrians and cyclists) and the lane of the mountain road in the direction of Alt-Rüdersdorf will be closed on the Kalkgrabenbrücke during the inspection period on 10 and 11 June 2025.
The following bridges in Rüdersdorf have already been inspected:
- Henning Bridge: 13/14 May 2025
- Miners' footbridge: 20/22 May 2025
- Peter-Lübkes-Brücke: 4./5.6.2025


